Installation
and Operation
P1700040
15
5
Installation and Operation
5.1 Unpacking
Carefully unpack the rotary vane pump. Keep all paperwork and inspection tags for future reference.
Check the pump for:
Transport damage
Conformity with the specifications of the supply contract (model, electrical supply
data)
Completeness of the delivery
Please inform us without delay if there are discrepancies between the delivery and the contractually
agreed scope of delivery, or if damage is detected.
Please take note of the general terms of business of the manufacturing firm.
In case of a claim under warranty, the device must be returned in packaging that is suitable for
protecting it during transport.
5.2 Pump Mounting
For more rigid mounting requirements the pump base can be bolted directly to a surface using the 2
mounting holes and 2 slots featured on the base.
Fig. 7 Pump mounting
5.3 Pump Location / Environmental Conditions
The pump should be located in a clean and well-ventilated area and adequate space should be
provided wherever possible for routine maintenance such as oil changes. For best performance, the
pump should be located as closely as possible to its system. Determining factors for pump location
should include length and size of connections, the number of bends, and the type of exhaust
connections.