G
G
S
S
L
L
A
A
r
r
t
t
i
i
r
r
a
a
I
I
n
n
s
s
t
t
a
a
l
l
l
l
a
a
t
t
i
i
o
o
n
n
M
M
a
a
n
n
u
u
a
a
l
l
w
w
w
w
w
w
.
.
g
g
a
a
r
r
a
a
v
v
e
e
n
n
t
t
a
a
.
.
c
c
a
a
G
G
S
S
L
L
A
A
r
r
t
t
i
i
r
r
a
a
I
I
n
n
s
s
t
t
a
a
l
l
l
l
a
a
t
t
i
i
o
o
n
n
M
M
a
a
n
n
u
u
a
a
l
l
-
-
2
2
4
4
-
-
2
2
0
0
0
0
4
4
G
G
a
a
r
r
a
a
v
v
e
e
n
n
t
t
a
a
(
(
C
C
a
a
n
n
a
a
d
d
a
a
)
)
L
L
t
t
d
d
.
.
P
P
a
a
r
r
t
t
#
#
1
1
5
5
5
5
2
2
8
8
R
R
e
e
v
v
D
D
P
P
r
r
i
i
n
n
t
t
e
e
d
d
i
i
n
n
C
C
a
a
n
n
a
a
d
d
a
a
Figures 21 to 24 show the lower carriage arrangement on the lower tube. To install the
lower conical rollers, 1 -lubricate the shaft of the shoulder-bolt, 2 –put the bolt through
the roller, 3 -apply a small amount of thread-locking compound to the end of the
shoulder-bolt threads, and 4 -install the roller.
The conveyance is shipped with the platform
manually
folded up. This is done in the
factory by simply lifting the platform up. This releases the “clutch” from the folding
mechanism. You may lower the platform by simply pulling it down carefully. Once it
reaches the horizontal position, the clutch should re-engage with a snap. If it does not re-
engage by itself, it will do so when you operate the fold system later
.
Figures 25, 26, 27, & 28.
Installation of the lower conical rollers.
25
26
27
28
Grease
Thread
lock
Summary of Contents for GSL Artira
Page 2: ......