11. Double check your center marks on the ceiling with your Smart Track pieces.
Each Smart Track should cover four of the marks. The center stud marks should
be visible through the track's holes.
12. Double check that each set of marks are 15 inches apart.
13. Using the included 6 mm drill bit, drill a vertical pilot hole at least three inches
into each center mark you made.
14. Hold your Smart Track in place over one of the holes you drilled and screw in a
lag screw and washer almost all the way, so you can still move the Smart Track.
Summary of Contents for Hard Top Lifter
Page 1: ...Installation and Operation Guide ...
Page 3: ...To create a Flex Group 34 ...
Page 28: ......