GAT Vending 6100 BA
Startup and Configuration
www.gantner.com
HB_GAT-VENDING6100BA--EN_121
19
5
STARTUP AND CONFIGURATION
Ensure the installation process and electrical connections have been carried out as described in the previous
chapters. The GAT Vending 6100 BA starts automatically when power is applied to the device.
For the configuration of the GAT Vending 6100 BA, the difference between the
system settings
and the
configuration settings
must be clarified. The system settings affect how the device communicates with the
network and the configuration settings affect how the device operates and interacts with the user.
5.1 Starting the GAT Vending 6100 BA
The startup process begins when power is supplied to the GAT Vending 6100 BA. The GANTNER logo and the
currently installed software version ("BL-Vers.") is displayed. The status LEDs flash green and red alternately and
the terminal searches for a connection to the vending machine and network.
Figure 5.1
– Start screen of the GAT Vending 6100 BA
The startup process takes up to one minute after which the terminal displays the current system settings.
Summary of Contents for GAT Vending 6100 BA
Page 2: ......
Page 46: ...GAT Vending 6100 BA Technical Data 46 HB_GAT VENDING6100BA EN_121 www gantner com ...
Page 47: ......