© Galvin Engineering Pty Ltd
Product Installation Guidelines
Version 1, 19 October 2022, Page
4
of
25
6.0
PRE-INSTALLATION
MOUNTING DETAILS
– WALL PREPARATION
1. Cut out hole in wall as per dimensions shown below. The depth of the hole must be between 75 and 95mm
from the finished wall face.
2. Drill four holes located as per picture below using drill diameter suitable for mounting system (not supplied)
that will be used for the box installation.