![Galvanic Applied Sciences ProTech903 Operation Manual Download Page 155](http://html1.mh-extra.com/html/galvanic-applied-sciences/protech903/protech903_operation-manual_3298733155.webp)
Revision 14
155
August 02, 2019
7.4 Checking the H
2
S Sample System
On a periodic basis, the H
2
S sampling system should be inspected and cleaned to ensure an
optimum flow of sample gas to the analyzer.
To check the sampling system:
a) Turn off gas supply and block valves
b) Check the filter element – replace if required
c) Check that the sample pressure is set at 15 psig.
d) Check sample flow on the chassis flow meter is somewhere between 1.5 and 2.0 on the
tube scale
7.5 Total Sulfur Sample System
To check the Total Sulfur Sample System:
a) Place the analyzer in the Total Sulfur Analysis mode.
b) Check that the Hydrogen or Sample flows have not decreased from their setup positions.
If they have it may indicate a partial blockage from coke build up in the quartz tube inside
the total sulfur furnace.
c) If there is no flow indication through the total sulfur flow meters, a total blockage of the
quartz tube may have occurred and it will be necessary to replace the tube (Section 7.6).
Summary of Contents for ProTech903
Page 2: ......
Page 96: ...Revision 14 96 August 02 2019 Figure 5 19 Event Log...
Page 122: ...Revision 14 122 August 02 2019 Figure 5 38 Typical Modicon with Floating Point List...
Page 124: ...Revision 14 124 August 02 2019 Figure 5 40 Expanded Modbus Nodes...
Page 175: ...Revision 14 175 August 02 2019 Figure 9 17 Non Isolated 4 20 mA Inputs...
Page 190: ...Revision 14 190 August 02 2019...