2.4 Installation Steps
Installation of the 962-AGX analyzer system consists of the following steps
•
• Mounting of the Analyzer System (Section 2.4.1)
•
• Sample Line and Sample Return Line Connections (Section 2.4.2)
•
• Connection of the AC Power Service (Section 2.4.3)
•
• Connection of the Analog Signal Cables (Section 2.4.4)
•
• Connection of the Digital Signal Cables (Section 2.4.5)
•
• Connection of the Instrument Air Services (Section 2.4.6)
•
• Connection of the Zero Gas Service (Section 2.4.7)
•
• Connection of the ‘Loss of Purge Signal’ (Section 2.4.8)
The user should read each step and make certain that it is fully understood
before proceeding to installing the analyzer.
2.4.1 Mounting of the Analyzer System
The framework that is used in the analyzer system must be securely attached to a support
structure provided by the end user.
The analyzer should be tightly bolted in place. The analyzer system frame has four (4) 3/4"
diameter holes to accommodate the mounting to the plant support structure. The plant
support structure should be suitable for mounting the analyzer frame as shown in Figure 2-1.
Figure 2-1: Customer Connections
Figure 2-1 indicates the location of the various connections that have to be made.
Summary of Contents for 962-AGX
Page 43: ...Revision 1 43 9 10 2019 Figure 4 13 Network Sub Panel...
Page 86: ...Revision 1 86 9 10 2019 Figure 9 1 Customer Connections...
Page 87: ...Revision 1 87 9 10 2019 Figure 9 2 Analyzer Components...
Page 88: ...Revision 1 88 9 10 2019 Figure 9 3 Inputs and Outputs...
Page 89: ...Revision 1 89 9 10 2019 Figure 9 4 AC Wiring Overview...
Page 90: ...Revision 1 90 9 10 2019 Figure 9 5 DC Wiring Overview...