Revision 1
16
9/10/2019
2.3 Unpacking
The 962-AGX analyzer system is packed for shipment in a wooden crate.
To unpack the system:
a) Remove the lid by undoing the marked lag bolts.
b) Once the lid is off, remove the excess packing material and boxes from the shipping
crate.
c) Visually inspect the small packages to ensure that no major damage has occurred. If
damage has occurred, contact the shipping company and Galvanic Applied Sciences.
Place the small packages aside in a safe, secure storage area as they are not needed at
this stage of the system installation.
The analyzer weighs approximately 250 lb/113 kg. Use suitable precautions
when removing it from the crate and placing it in the facility.
d) Locate and remove the four (4) bolts that secure the analyzer framework to the 2' x 4'
boards at the bottom of the shipping crate.
e) Once the bolts are removed, the analyzer system can be lifted from the crate.
f) Lay the analyzer system frame onto a structurally strong and level surface and inspect for
any visual damage.
g) Remove the plastic wrap from the analyzer system to gain access to the doors of the
cabinets.
h) Open the cabinet doors and
carefully
remove the packing material from inside the
cabinet.
Care should be taken while removing the cabinet packing material so that
no hardware or wiring is damaged.
i) Inspect the internal equipment to ensure that no damage has occurred and that no
components have become loose during transport.
If any damage is visible contact Galvanic Applied Sciences Inc. immediately and do not
proceed with the system installation. Do not attempt to facilitate repairs yourself as this
will negate and/or invalidate any possible insurance claim or equipment warranty.
j) If no damage is apparent, the analyzer system is ready for transport to the installation
(sample point) site. The analyzer system framework has two (2) lifting rings located at the
top. Installation of proper clevises is recommended. The lifting rings are rated for
approximately 227 kg / 500 lbs per ring.
Summary of Contents for 962-AGX
Page 43: ...Revision 1 43 9 10 2019 Figure 4 13 Network Sub Panel...
Page 86: ...Revision 1 86 9 10 2019 Figure 9 1 Customer Connections...
Page 87: ...Revision 1 87 9 10 2019 Figure 9 2 Analyzer Components...
Page 88: ...Revision 1 88 9 10 2019 Figure 9 3 Inputs and Outputs...
Page 89: ...Revision 1 89 9 10 2019 Figure 9 4 AC Wiring Overview...
Page 90: ...Revision 1 90 9 10 2019 Figure 9 5 DC Wiring Overview...