Revision 4
22
August 02, 2019
agency safety procedures and rules should be adhered to. Breathing
apparatus and personal protective equipment (
ie.
gloves, coveralls and
protective eye wear) should be worn and a safety person(s) should be
observing.
Do not take unnecessary risks even if you believe the tailgas
line to be at negative pressure.
b) Open the steam jacketed ball valve and continue inserting the probe until the probe
flange contacts the packing gland.
c) Tighten the packing gland and connect the tubing to the probe.
If the connections are leak-tight and company safety personnel have
deemed the atmosphere to be safe, breathing apparatus may now be
removed.
2.4.3 Connection of the AC Power Service
2.4.4 Connection of the Analog Signal Cables
2.4.5 Connection of the Digital Signal Cables
2.4.6 Connection of Instrument Air Services
943-TGX-CE
Refer to the User Manual Section 2.7.4.
943-TGX-CE
Refer to the User Manual Section 2.7.5.
943-TGX-CE
Refer to the User Manual Section 2.7.6.
943-TGX-CE
Refer to the User Manual Section 2.7.8 2.7.7.
Summary of Contents for 943-TGX
Page 48: ...Revision 4 48 August 02 2019 Figure 4 13 Network Sub Panel...
Page 94: ...Revision 4 94 August 02 2019 Figure 9 3 Control Cabinet Detail...
Page 96: ...Revision 4 96 August 02 2019 Figure 9 5 AC Wiring Diagram...
Page 97: ...Revision 4 97 August 02 2019 Figure 9 6 DC Signal and Wiring Diagram...
Page 98: ...Revision 4 98 August 02 2019 This Page Intentionally Blank...