1.  Cut shipping banding from carton and platform.

 

2.  Install lift handle into base frame weldment and secure in place with cotterless hitch pins.

 

3.  Remove the wood chocks from around the caster wheels.

 

4.  Carefully roll the lift off the shipping pallet onto the floor.

 

Prepare The Air Pump For Operation

 

A. Pictogram Definitions

 

 

Activating the pump with the pedal end marked with this pictogram, 

the flow of fluids is directed out of the reservoir.

 

 

 

Activating the pump with the pedal end marked with this pictogram, 

the flow of fluids is directed back to the reservoir.

 

 

 

 

B. Cut shipping tie straps from air pump.

 

C. Air Supply Hook Up

 

1. Remove the thread protector from the air inlet of the pump. The pump's air inlet is 

mettere 

dimensioni tubazione

 

( interna esterna) 

internal threads. Select and install the threaded fittings 

which are compatible with your air supply fittings. The air supply should be 

quanty CFM

 

(

M³/min.)

 

at 100 PSI (7 BAR) at the pump to obtain the rated hydraulic pressure. Air pressure should be 

regulated to between 50 PSI (3.5 BAR) and 140 PSI (9.5 BAR). A pressure of 100 PSI (7 BAR) is 

the recommended minimum. Secure your pump fitting to the air supply.

 

2. It is highly recommended to install an automatic air line oiler to the air supply as close to the pump 

as possible. Set the unit to feed approximately one drop of oil per minute into the system. Use SAE 

grade oil, 

quale W

 

 

D. Priming The Pump Unit

 

Under certain circumstances it may be necessary to prime the air pump. 

To accomplish this, perform the following procedure:

 

1. Press the release end of the pedal while holding down 

the air intake valve with a flathead screwdriver. The air 

intake valve is located directly under the pedal in the area 

marked 

. The valve is depressed simultaneously 

with the area of the pedal during priming.

 

2. Allow the pump to cycle approximately 15 seconds.

 

 

 

 

 

 

 

 

Air

 

3. Remove the screwdriver and press the 

end of the 

pedal once more.

 

4. If the cylinder extends or pressure builds, the pump has 

been successfully primed. If the pump does not respond, 

repeat the procedure, jogging the air intake valve while

 

Filler/ 

Vent 

Cap

 

 

Air Inlet

 

(1/4-18 NPT

 

Intake 

Valve

 

holding the pedal in the

 

position.

 

internal)

 

  

 

Summary of Contents for BLP 1000

Page 1: ...uniquely designed for removal and installation of electric vehicle batteries This product can also be used for removal and installation of various other components such as engines transaxles fuel tan...

Page 2: ...se Use only those repair parts called out in the parts list in this document Items found in the parts list have been carefully tested and selected Do not exceed the rated capacity of lift or platform...

Page 3: ...obtain the rated hydraulic pressure Air pressure should be regulated to between 50 PSI 3 5 BAR and 140 PSI 9 5 BAR A pressure of 100 PSI 7 BAR is the recommended minimum Secure your pump fitting to t...

Page 4: ...zation Feature 1 Insert leveler screws into sockets approx 5 turns Leveler screws should not project abovesteel tube or contact platform underside when not in use See Figure 2 of Stabilization Feature...

Page 5: ...surface the sliding platform extension may be used to facilitate the separation of powertrain components i e engine and transmission Retract spring plunger and pull on Table Handle See Figure 3 to ex...

Page 6: ...ated holes or missing hardware If damage is found discontinue use Use only those repair parts called out in the parts list in this document Items found in the parts list have been carefully tested and...

Page 7: ...ing i e upper lower rollers casters scissor hydraulic cylinder pivot pins etc Pump grease into fitting until only new grease can be seen escaping from joint Wipe awayexcess F Cleaning 1 Wipe dirt debr...

Page 8: ...Back Sheet 4 of 7 EXPLODED DRAWING AND LIST OF MACHINE...

Page 9: ...torque tube 1 7 A 01 06guide rail 1 8 A 01 07Safety claw support 4 9 A 01 09Caster mounting plate 1 10 A 01 10Bottom frame plate 4 11 A 01 11Bottom frame support 2 12 A 01 12reinforce of guide rail 2...

Page 10: ...necting rod main body 1 34 B 03 02Upper outer connecting rod reinforcement sleeve 2 35 B 04 01shaft of roller 2 36 B 04 02Upper ear support 1 37 B 04 03Inner connecting rod stiffener 2 38 B 04 04Oil c...

Page 11: ...ylinder cover 1 57 D 01 01plunger pole45 695 1 58 D 01 05guide block 1 59 E 01safety claw 2 60 E 02 01Safety rack fixing plate 1 61 E 02 02Main body of safety rack 1 62 E 03shaft of safety claw 2 63 t...

Page 12: ...Back Sheet 5 of 7 22 23...

Page 13: ...Sheet 5 of 7 USER S MANUAL...

Page 14: ...1700mm Initial height of the platform 570mm 570mm Platform length 1300mm 1300mm Platform width 787mm 787mm Lifting Time about 45s about 45s Lowering time about 55s about 55s Overall width 787mm 787mm...

Reviews: