3E4465 Gallagher HBUS 8 Port Hub Installation Note | Edition 4 | January 2021
Copyright © Gallagher Group Limited
Page 5
The In port has an optional termination jumper J2 TERM. Whether this jumper is used or not
should be based on the In port to Controller wiring.
2.4
Connections
Note:
Run a common ground (-ve) from the HBUS 8 Port Hub for all RS485 devices.
2.5
Component layout