MAINTENANCE
MAINTENANCE PROCEDURE
4-75
EVERY 5000 HOURS MAINTENANCE
4
Maintenance for every 10, 100, 250, 500, 1000 and 2000 hours service should be carried out at the same time.
CHANGE OIL IN HYDRAULIC TANK
4
WARNING
q
The parts and oil are at high temperature after the engine is stopped, and may cause burns. Wait for
the temperature to go down before starting the work.
q
When removing the oil filler cap, turn it slowly to release the internal pressure, then remove it.
q
Refill capacity: 360 liters (95.1 US gal)
q
Prepare a handle for socket wrench set
1. Swing the upper structure so that the drain plug under the
hydraulic tank will be between both tracks.
2. Retract the arm and bucket cylinders, then lower the boom
and put the teeth in contact with the ground.
3. Set the safety lock lever to the LOCK position and stop the
engine.
4. Remove the cap of oil filler (F) at the top of the hydraulic tank.
5. Set the container to catch the oil under the drain plug at the
bottom of the chassis. Remove drain plug (P1), then loosen
plug (P2) and drain the oil. After draining the oil, tighten drain
plugs (P1) and (P2).
Tightening torque: 68.6 ± 9.8 N
·
m (7 ± 1 kgf
·
m, 50 ± 7 lbft)
(A): Rear
Summary of Contents for PC600-7
Page 2: ...1 1 FOREWORD 11 ...
Page 4: ...FOREWORD FOREWORD 1 3 ...
Page 5: ...FOREWORD FOREWORD 1 4 ...
Page 18: ...2 1 SAFETY 12 ...
Page 22: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 ...
Page 28: ...SAFETY SAFETY LABELS 2 11 19 Jump start prohibited 09842 A0481 ...
Page 59: ...3 1 OPERATION 13 ...
Page 168: ...MACHINE OPERATIONS AND CONTROLS OPERATION 3 110 Boom operation Bucket operation ...
Page 211: ...4 1 MAINTENANCE 4 ...
Page 277: ...MAINTENANCE MAINTENANCE PROCEDURE 4 67 q Center frame A Important check points q Boom ...
Page 288: ...5 1 SPECIFICATIONS 15 ...
Page 291: ...6 1 ATTACHMENTS AND OPTIONS 16 ...
Page 299: ......