MAINTENANCE
MAINTENANCE PROCEDURE
4-71
CLEAN ENGINE BREATHER
4
WARNING
q
The parts and oil are at high temperature after the engine is stopped, and may cause serious burns.
Wait for the temperature to go down before cleaning the engine breather.
q
When using compressed air, there is a hazard that dirt may be blown up and cause serious injury.
Always use safety glasses, dust mask, or other protective equipment.
1. Wipe away dust around the breather.
2. Remove breather (1).
3. Rinse the whole breather in diesel oil or flushing oil. Dry with
compressed air, then install it.
4. Replace O-ring with new one. Coat a new O-ring with engine
oil, set it, then install breather (1).
CLEAN, CHECK TURBOCHARGER
4
Contact your Komatsu distributor for cleaning and inspection.
CHECK ALTERNATOR, STARTING MOTOR
4
The brushes may be worn, or the bearing may have run out of grease, so contact your Komatsu distributor for
inspection or repair.
When the engine is frequently started, ask for inspection every 1000 hours or every 6 months, whichever comes
sooner.
CHECK ENGINE VALVE CLEARANCE, ADJUST
4
As special tool is required for removing and adjusting the parts, you shall request Komatsu distributor for service.
CHECK INJECTOR
4
Check the color of the exhaust gas visually. If there is any abnormality in the exhaust gas color, contact your
Komatsu distributor for inspection.
For details, see "TROUBLES AND ACTIONS (3-139)" "Exhaust color is black".
Summary of Contents for PC600-7
Page 2: ...1 1 FOREWORD 11 ...
Page 4: ...FOREWORD FOREWORD 1 3 ...
Page 5: ...FOREWORD FOREWORD 1 4 ...
Page 18: ...2 1 SAFETY 12 ...
Page 22: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 ...
Page 28: ...SAFETY SAFETY LABELS 2 11 19 Jump start prohibited 09842 A0481 ...
Page 59: ...3 1 OPERATION 13 ...
Page 168: ...MACHINE OPERATIONS AND CONTROLS OPERATION 3 110 Boom operation Bucket operation ...
Page 211: ...4 1 MAINTENANCE 4 ...
Page 277: ...MAINTENANCE MAINTENANCE PROCEDURE 4 67 q Center frame A Important check points q Boom ...
Page 288: ...5 1 SPECIFICATIONS 15 ...
Page 291: ...6 1 ATTACHMENTS AND OPTIONS 16 ...
Page 299: ......