MAINTENANCE
MAINTENANCE PROCEDURE
4-69
EVERY 2000 HOURS MAINTENANCE
4
Maintenance for every 10, 100, 250, 500 and 1000 hours service should be carried out at the same time.
CHANGE OIL IN FINAL DRIVE CASE
4
WARNING
q
The parts and oil are at high temperature immediately after the engine is stopped, and may cause seri-
ous burns. Wait for the temperature to go down before starting the operation.
q
If there is still pressure remaining inside the case, the oil or plug may fly out.
Loosen the plug slowly to release the pressure.
q
Refill capacity: each 10 liters (2.6 US gal)
q
Prepare a handle.
1. Set the TOP mark at the top, with the TOP mark and plug (P)
perpendicular to the ground surface.
2. Remove plugs (P) and (F) with the handle and drain the oil.
REMARK
Check the O-rings in the plugs for damage. If necessary, replace
with new ones.
3. Tighten plug (P).
4. Add engine oil through the hole of plug (F).
5. When the oil overflows from the hole of plug (F), install plug
(F). Tighten plugs (P) and (F).
Tightening torque of plugs (P) and (F) :
68.6 ± 9.8 N
·
m (7 ± 1 kgf
·
m, 50 ± 7 lbft)
Summary of Contents for PC600-7
Page 2: ...1 1 FOREWORD 11 ...
Page 4: ...FOREWORD FOREWORD 1 3 ...
Page 5: ...FOREWORD FOREWORD 1 4 ...
Page 18: ...2 1 SAFETY 12 ...
Page 22: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 ...
Page 28: ...SAFETY SAFETY LABELS 2 11 19 Jump start prohibited 09842 A0481 ...
Page 59: ...3 1 OPERATION 13 ...
Page 168: ...MACHINE OPERATIONS AND CONTROLS OPERATION 3 110 Boom operation Bucket operation ...
Page 211: ...4 1 MAINTENANCE 4 ...
Page 277: ...MAINTENANCE MAINTENANCE PROCEDURE 4 67 q Center frame A Important check points q Boom ...
Page 288: ...5 1 SPECIFICATIONS 15 ...
Page 291: ...6 1 ATTACHMENTS AND OPTIONS 16 ...
Page 299: ......