TROUBLES AND ACTIONS
OPERATION
3-142
TOWING THE MACHINE
3
WARNING
q
When towing the machine, use a wire rope that has ample strength for the weight of the machine that
is being towed.
q
Do not apply a sudden load to the wire rope.
If the machine sinks in mud and cannot get out under its own
power, or if the drawbar pull of the excavator is being used to tow
a heavy object, use a wire rope as shown in the diagram on the
right.
Place pieces of wood between wire ropes and body to prevent
damage to ropes and body.
At this time, never use the hole for light-weight towing.
SEVERE JOB CONDITION
3
q
When carrying out digging operations in water, if the work equipment mounting pin goes into the water, carry
out greasing every time the operation is carried out.
q
For heavy-duty operations and deep digging, carry out greasing of the work equipment mounting pins every
time before operation.
After greasing, operate the boom, arm and bucket several times, then grease again.
Summary of Contents for PC600-7
Page 2: ...1 1 FOREWORD 11 ...
Page 4: ...FOREWORD FOREWORD 1 3 ...
Page 5: ...FOREWORD FOREWORD 1 4 ...
Page 18: ...2 1 SAFETY 12 ...
Page 22: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 ...
Page 28: ...SAFETY SAFETY LABELS 2 11 19 Jump start prohibited 09842 A0481 ...
Page 59: ...3 1 OPERATION 13 ...
Page 168: ...MACHINE OPERATIONS AND CONTROLS OPERATION 3 110 Boom operation Bucket operation ...
Page 211: ...4 1 MAINTENANCE 4 ...
Page 277: ...MAINTENANCE MAINTENANCE PROCEDURE 4 67 q Center frame A Important check points q Boom ...
Page 288: ...5 1 SPECIFICATIONS 15 ...
Page 291: ...6 1 ATTACHMENTS AND OPTIONS 16 ...
Page 299: ......