When transporting the machine, observe all related laws and regulations, and be careful to assure safety.
PRECAUTIONS FOR TRANSPORTATION
3
WARNING
This machine must be divided into several units for transportation.
When transporting the machine, please consult your Komatsu distributor.
LIFTING MACHINE
3
WARNING
q
Never carry out the lifting operation with any person on the machine.
q
Always make sure that the wire rope used for lifting the machine is of ample strength for the weight of
the machine.
q
Never try to lift the machine in any posture other than the posture given in the procedure below.
There is danger that the machine may lose its balance.
q
When lifting the machine, pay careful attention to the center of gravity to maintain the balance.
When lifting the machine, carry out the operation on flat ground as follows.
1. When lifting the machine, choose level ground and do as follows.
Pass the wire ropes between the 1st and 2nd track rollers from the front of the machine and the 1st and 2nd
track rollers from the rear.
However, if the machine is equipped with a track roller guard, pass the wire ropes under the track.
2. Set the lifting angle of the wire rope to 30
°
to 40
°
, then lift the machine slowly.
3. After the machine comes off the ground, stop the lifting operation and wait for the machine to stabilize, then lift
the machine slowly.
q
The lifting load is 35 tons.
Summary of Contents for PC600-7
Page 2: ...1 1 FOREWORD 11 ...
Page 4: ...FOREWORD FOREWORD 1 3 ...
Page 5: ...FOREWORD FOREWORD 1 4 ...
Page 18: ...2 1 SAFETY 12 ...
Page 22: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 ...
Page 28: ...SAFETY SAFETY LABELS 2 11 19 Jump start prohibited 09842 A0481 ...
Page 59: ...3 1 OPERATION 13 ...
Page 168: ...MACHINE OPERATIONS AND CONTROLS OPERATION 3 110 Boom operation Bucket operation ...
Page 211: ...4 1 MAINTENANCE 4 ...
Page 277: ...MAINTENANCE MAINTENANCE PROCEDURE 4 67 q Center frame A Important check points q Boom ...
Page 288: ...5 1 SPECIFICATIONS 15 ...
Page 291: ...6 1 ATTACHMENTS AND OPTIONS 16 ...
Page 299: ......