G.S.I DC Installation and Operation Guide
25
Figure 31: Stop Test Sequence Screen
To test the fertilizer:
Press mode
and – at the same time to open the fertilizer for 15
seconds.
Figure 32: Fertilizer Test Screen
To test the Master valve:
1.
Press
until the Test screen is displayed (Figure 29).
2.
Press
–
to open the Master valve for 30 seconds.
Creating an Irrigation Program
Notes:
When locally creating the irrigation program: