Page 1: ......
Page 2: ...ctrical Symbol 3 III Technical Specifications 4 IV Structure 6 V Operation Method 6 1 Phase sequence detection 6 2 Live line detection simple power detection 7 3 Missing phase judgment disconnection s...
Page 3: ...clamp is not removed from the tested line u Use disassembly and repair of this instrument must be performed by authorized personnel u Due to the reason of this instrument if it is dangerous to continu...
Page 4: ...r inspection open circuit search break point location and line maintenance Non contact phase detector detects quickly and easily shows at a glance greatly improves the safety of field tests effectivel...
Page 5: ...Hz Automatic Identification Live electricity range AC70 1000V 45 65Hz Sine wave continuous input Conducted electrostatic detection Measuring the highest voltage AC1000V Clamp wire size Outside diamete...
Page 6: ...omatically shuts down to reduce battery consumption Battery voltage When the battery voltage drops to about 5 2V the battery voltage is low symbol to remind to replace the battery Instrument weight In...
Page 7: ...uence indicator light 4 7 Power indication 8 Low battery voltage indication 9 Switch button V Operation Method 1 Phase sequence detection Danger There is high pressure Please pay special attention to...
Page 8: ...Press the black ON OFF button to shut down The instrument will automatically shut down after about 5 minutes of power on to reduce battery consumption 2 Live line detection simple power detection Dan...
Page 9: ...ity 1 Before replacing the battery the clamp must be removed from the wire to be inspected Do not replace the battery during the test 2 Press the ON OFF button to shut down 3 Loosen the instrument bat...
Page 10: ...ZhengNeng Electronics Technology Co Address 2F No 15 Baoshu Road Taihe Baiyun District Guangzhou Guangdong China Toll free call 4000 1515 38 Tel 86 20 36544172 Fax 86 20 37319075 Post 510540 WebSite w...