10 |
P a g e
The above is a drawing showing the lengths of tube required and the positions of drilled holes, the
holes are drilled fully through the tubes.
Step 4 – Tower Tube Assembly
Lay the three tower sections in order on the ground starting with the bottom section with the hole
close to the base hinge bracket already fixed to the centre ground anchor. Thread the length of cable
pulling rope through this tower section (and subsequent tower sections) for cable pulling when
ready. Slide the supplied ‘Tee’ piece onto the bottom of the tube.