13
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
5
Fastening screws
Fastening screws
2. Introduction
Thank you for having chosen a SCAN D-200 / SCAN H-250 MKS. You acquired a versatile, powerful and intelligent
light effect.
Unpack your SCAN D-200 / SCAN H-250 MKS and make sure that there are no damages caused by transporta-
tion. Should there be any, please consult your local dealer and do not take the device into operation.
2.1 Measurements and description of components
1 - Bracket
8 - DIP switches for projector selection
2 - Bracket screws
9 - DMX Input
3 - Screws for the adjustment of objective lens
10 - DMX Output
4 - Objective lens
11 - Mains plug
5 - Mirror
12 - Fuseholder
6 - Fastening screws
13 - Earthing screw
7 - Cooling fan
14 - DMX Control lamp
2. 2 Fitting the lamp
DANGER !
Install the lamps with the device switched off only.
Unplug from mains before !
To insert the lamps (
D-200:
MSD 200W / 70V;
H-
250 MKS:
HLX 250W / 24V) open the housing by
loosening the fastening screws at the side panels.
Do not install a lamp with a higher wattage! A lamp
like this generates temperatures neither the device
nor the transformer is designed for. Damages
caused by non-observance are not subject to war-
ranty.
(QJOLVK
Summary of Contents for Scan D-200
Page 1: ...1...