1. HOW TO INSTALL THE SYSTEM
1-13
1.5
IF Unit
Refer to the outline drawing at the back of this manual for mounting dimensions. Fas-
ten the unit with 5
20 self-tapping screws. If the unit is to be installed on a bulkhead,
be sure that the location does not allow water to drip into the cable entrance.
Note:
When connecting an Echo sounder, switch S4 on the POE-HUB in the IF unit
to OFF. (See figure below for reference.) If S4 is not switched to OFF, the FSV-85 will
not turn on.
1.6
Attachment Kit (option)
The attachment kit permits use of the retraction tank for the CSH-80 series.
OP10-30. Code No. 000-067-179
1. Clean the flange and O-ring groove of the retraction tank (welded to hull) with ethyl
alcohol moistened waste cloths. Coat O-ring and O-ring groove with lithium
grease. Place the O-ring in its groove on the tank flange.
2. Lay the insulation gaskets (1) on the top of the tank flange.
3. Position the hull unit so that the bow mark (inscribed) on its flange points toward
the ship's bow. Note that heading adjustment in the monitor is required if the bow
mark does not physically face the ship's bow.
4. Confirm the following points as below and place the hull unit on the tank.
• Clean the flange platform.
• Wipe the undersurface of the hull unit flange with clean waste cloths.
• Keep O-ring in its groove.
5. Insert the flat washers and insulation gaskets (2) into the bolt holes of the tank
flange.
6. Coat threads of the bolts with a slight amount of lithium grease to prevent scorch-
ing. Insert the bolts with washers from the retraction tank flange, and then put the
flat washers and spring washers in this order from above. Fasten bolts with nuts.
Name
Type
Code No.
Qty
Insulation Gasket (1)
SHG-0003-1
100-038-571
1
Insulation Gasket (2)
MS-1000-68-1
100-347-611
16
O-ring
C00117A
000-158-976-10
1
POE-HUB
S4
ON
OFF
Summary of Contents for FSV-85
Page 28: ...1 HOW TO INSTALL THE SYSTEM 1 20 This page is intentionally left blank ...
Page 56: ...3 ADJUSTMENTS AND CHECKS 3 10 This page is intentionally left blank ...
Page 67: ...12 Nov 2010 Y NISHIYAMA D 1 ...
Page 68: ...4 Feb 2011 Y NISHIYAMA D 2 ...
Page 69: ...5 Nov 2010 Y NISHIYAMA D 3 ...
Page 70: ...4 Apr 2014 H MAKI D 4 ...
Page 71: ...6 Jul 2012 Y NISHIYAMA D 5 ...
Page 72: ...Nov 22 06 T Matsuguchi D 6 ...
Page 73: ...22 Apr 2013 Y NISHIYAMA D 7 ...
Page 74: ...22 Apr 2013 Y NISHIYAMA D 8 ...
Page 75: ...26 Nov 2010 Y NISHIYAMA D 9 ...
Page 76: ...27 Dec 2010 Y NISHIYAMA D 10 ...
Page 77: ...Nov 22 06T Matsuguchi D 11 ...
Page 78: ...D 12 ...
Page 79: ...29 Mar 2011 Y NISHIYAMA D 13 ...
Page 80: ...13 Sep 2011 Y NISHIYAMA D 14 ...
Page 81: ...13 Sep 2011 Y NISHIYAMA D 15 ...
Page 82: ...Mar 14 07 R Esumi D 16 ...