AP-1
APPENDIX 1 GLOSSARY
A
B
C
E
G
H
I
K
L
ATC
Auxiliary Terrestrial Component. Hybrid satellite terrestrial systems that use ter-
restrial repeaters to combine the wide area coverage capabilities of geostationary
or low earth orbit satellites with urban coverage and in building penetration pro-
vided from terrestrial networks.
AWG
American Wire Gauge. A means of specifying wire diameters.
BGAN
Broadband Global Area Network. A mobile satellite service that offers high-speed
data up to 492 kbps and voice telephony. BGAN enables users to access e-mail,
corporate networks and the Internet, transfer files and make telephone calls.
CM
Continuous Monitoring
EIRP
Effective Isotropically-Radiated Power. The amount of power that would have to
be emitted by an isotropic antenna (that evenly distributes power in all directions)
to produce the peak power density observed in the direction of maximum antenna
gain.
ESD
ElectroStatic Discharge
GPS
Global Positioning System. A system of satellites, computers, and receivers that
is able to determine the latitude and longitude of a receiver on Earth by calculating
the time difference for signals from different satellites to reach the receiver.
HF
High Frequency. The frequency band between 3 and 30 MHz. Used for medium
and long range terrestrial radio communication.
I/O
Input/Output
IP
Ingress Protection. An international standard which identifies the level of protec-
tion equipment has in order to prevent foreign object intrusion. This standard cov-
ers both fluid and air-borne particles. The “x” in an IP rating indicates that
equipment does not have protection for the abbreviated item; for example, “IPx4”
indicates that equipment has no water-proofing.
ISDN
Integrated Services Digital Network. A circuit-switched telephone network sys-
tem, designed to allow digital transmission of voice and data over ordinary tele-
phone copper wires, resulting in higher quality and speed than are available with
analog.
kbps
kilobits per second
LAN
Local Area Network
Summary of Contents for FELCOM251
Page 9: ...EQUIPMENT LISTS viii This page is intentionally left blank...
Page 53: ...3 CONNECTING POWER 3 6 This page is intentionally left blank...
Page 85: ...6 STARTING UP THE SYSTEM 6 6 This page is intentionally left blank...
Page 89: ...7 TROUBLESHOOTING 7 4 This page is intentionally left blank...
Page 107: ...D 1 31 Jan 2020 H MAKI...
Page 108: ...4 Feb 2020 H MAKI D 2...
Page 109: ...D 3 29 Jan 2019 H MAKI...
Page 110: ...D 4 31 Jan 2020 H MAKI...
Page 111: ...D 5 18 Feb 2019 H MAKI...
Page 112: ...D 6 18 Feb 2019 H MAKI...
Page 113: ...D 7 25 Sep 2018 H MAKI...
Page 114: ...D 8 12 Dec 2018 H MAKI...
Page 115: ...D 9 10 Sep 2019 H MAKI...
Page 116: ...D 10 10 Sep 2019 H MAKI...
Page 117: ...5 Aug 2013 H MAKI D 11...
Page 118: ...16 Jul 2014 H MAKI D 12...
Page 119: ...D 13 21 Apr 2017 H MAKI...
Page 120: ...D 14 31 Jan 2019 H MAKI...
Page 121: ...D 15 31 Jan 2019 H MAKI...