2. WIRING
2-60
2.8
Intelligent HUB (option)
Fix the LAN cables to the cable clamp with the cable ties (supplied).
No use.
Power port
Power Fail
LAN port
Ground wire
(IV-1.25sq., supplied)
DPYC-1.5 cable
DPYC-1.5 cable
To gateway network (ECDIS, radar, etc.)
Attach the LAN cap (supplied) to the unused connector
holes to meet waterproofing standard IPX2.
LAN cable
Cable clamp
Summary of Contents for FAR-3230SW-BB
Page 14: ...EQUIPMENT LIST xii This page is intentionally left blank ...
Page 36: ...1 INSTALLATION 1 22 This page is intentionally left blank ...
Page 112: ...3 SETTINGS AND ADJUSTMENTS 3 12 This page is intentionally left blank ...
Page 142: ...D 1 12 Sep 2014 H MAKI ...
Page 143: ...D 2 12 Sep 2014 H MAKI ...
Page 144: ...20 Jan 2014 H MAKI D 3 ...
Page 145: ...4 Jul 2014 H MAKI D 4 ...
Page 146: ...2 Nov 2012 Y NISHIYAMA D 5 ...
Page 147: ...13 Feb 2014 H MAKI D 6 ...
Page 148: ...24 Mar 2014 H MAKI D 7 ...
Page 149: ...24 Mar 2014 H MAKI D 8 ...
Page 150: ...18 Jan 2014 H MAKI D 9 ...
Page 151: ...18 Jan 2014 H MAKI D 10 ...
Page 152: ...18 Jan 2014 H MAKI D 11 ...
Page 153: ...7 Nov 2012 Y NISHIYAMA D 12 ...
Page 154: ...7 Nov 2012 Y NISHIYAMA D 13 ...
Page 155: ...7 Nov 2012 Y NISHIYAMA D 14 ...
Page 156: ...D 15 24 May 2012 Y NISHIYAMA ...
Page 157: ...D 16 24 May 2012 Y NISHIYAMA ...
Page 158: ...D 17 24 May 2012 Y NISHIYAMA ...
Page 159: ...7 Nov 2012 Y NISHIYAMA D 18 ...
Page 160: ...7 Nov 2012 Y NISHIYAMA D 19 ...
Page 161: ...7 Nov 2012 Y NISHIYAMA D 20 ...
Page 162: ...Apr 05 04 D 21 ...
Page 163: ...7 Nov 2012 Y NISHIYAMA D 22 ...
Page 164: ...D 23 13 Jan 2012 Y NISHIYAMA ...
Page 165: ...D 24 13 Jan 2012 Y NISHIYAMA ...
Page 166: ...D 25 13 Jan 2012 Y NISHIYAMA ...
Page 167: ...D 26 13 Jan 2012 Y NISHIYAMA ...