
5.2 Cable Fabrication
26
3. CIF/NMEA Data Signal Cable (CO-SPEVV-SB-C 0.2X5P)
Anticorrosive
Sheath
Armor
Vinyl sheath
Pin
Connector shell
Set Screw
Screw
Figure 5-4 Cable fabrication
4. Other Cables
All other cables are terminated at a terminal strip.
1) Processing the armor
<Cable passed through cable clamp>
Locate the armor in the cable clamp.
Figure 5-5 Cable
fabrication
<Cable passed through cable gland>
Solder a vinyl wire w/crimp-on lug to the armor and fasten it to the earth terminal.
Bare wire
Solder here.
Vinyl wire
Fasten to earth terminal.
Figure 5-6
Cable
fabrication
Summary of Contents for Doppler Speedlog DS-510
Page 3: ......
Page 4: ...ii ...
Page 6: ...DISTRIBUTION BOX MD 550 TERMINAL BOX DS 802 DISTANCE INDICATOR DS 840 ...
Page 10: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 39: ......
Page 40: ......
Page 41: ...knot knot ...
Page 42: ......
Page 43: ......
Page 45: ...38 ...
Page 46: ...39 ...
Page 48: ......
Page 49: ...Mar 27 03 D 2 Mar 27 03 ...
Page 50: ...Mar 27 03 D 3 Mar 27 03 ...
Page 51: ...H HAYASHI Feb 12 04 D 4 H HAYASHI Feb 12 04 D 4 ...
Page 52: ......
Page 53: ...Dec 17 07 R Esumi D 6 ...
Page 54: ......
Page 55: ...D 8 ...
Page 56: ......
Page 57: ...H HAYASHI Feb 12 04 D 10 ...
Page 58: ......
Page 60: ...D 13 ...
Page 61: ...D 14 ...
Page 62: ...D 15 ...