
5.2 Cable Fabrication
25
5.2 Cable
Fabrication
1. Transducer cable
Shorten considering location on terminal strip
Insulating tubing
FV1.25-4
FV1.25-4
FV1.25-4
Taping
Rubber gasket
Taping
Gland
To #16 terminal on terminal strip
Figure 5-1 Fabrication of transducer cable
2. Cable between transceiver unit, junction box and processor unit
(TTYCY-19S)
1) Transceiver unit/ junction box
Anticorrosive sheath
Rubber gasket
FV1.25-4
Washer
Armor
Note: 1. Unravel shield only
near terminal strip.
2. Fold back armor onto
washer and insert
between washer and
gland.
Figure 5-2 Cable fabrication
2) Processor unit
Cores and shields are fabricated the same as on transceiver unit/junction box side.
To ground the cable, remove paint from the armor and set the armor in the cable
clamp.
Figure 5-3 Cable fabrication
Summary of Contents for Doppler Speedlog DS-510
Page 3: ......
Page 4: ...ii ...
Page 6: ...DISTRIBUTION BOX MD 550 TERMINAL BOX DS 802 DISTANCE INDICATOR DS 840 ...
Page 10: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 39: ......
Page 40: ......
Page 41: ...knot knot ...
Page 42: ......
Page 43: ......
Page 45: ...38 ...
Page 46: ...39 ...
Page 48: ......
Page 49: ...Mar 27 03 D 2 Mar 27 03 ...
Page 50: ...Mar 27 03 D 3 Mar 27 03 ...
Page 51: ...H HAYASHI Feb 12 04 D 4 H HAYASHI Feb 12 04 D 4 ...
Page 52: ......
Page 53: ...Dec 17 07 R Esumi D 6 ...
Page 54: ......
Page 55: ...D 8 ...
Page 56: ......
Page 57: ...H HAYASHI Feb 12 04 D 10 ...
Page 58: ......
Page 60: ...D 13 ...
Page 61: ...D 14 ...
Page 62: ...D 15 ...