
1. MOUNTING
1-13
1.2 Pre-amplifier
Unit
Fix the pre-amplifier unit to the hull unit as follows:
1. Unfasten four hex. bolts (M6x12) to detach the mounting angles (2 pcs.) from the
pre-amplifier unit.
2. Fix the mounting angles onto the hull unit with M6x12 hex. bolts.
Hex. bolts are supplied with the hull unit.
3. Using the M6x12 bolts removed at step 1, fix the pre-amplifier unit to the mounting
angles.
Mounting angle (2 pcs.)
Pre-amplifier unit
M6x12, 8 pcs.
Mounting pre-amplifier unit
Summary of Contents for CSH-5L
Page 1: ...PRINTED IN JAPAN COLOR SCANNING SONAR CSH 5L ...
Page 18: ...1 MOUNTING 1 10 ...
Page 19: ...1 MOUNTING 1 11 ...
Page 64: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ......
Page 86: ......
Page 87: ......
Page 88: ......
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ......
Page 95: ......
Page 96: ......
Page 97: ......
Page 98: ......
Page 99: ......
Page 100: ......