![Furukawa electric S178 User Manual Download Page 136](http://html1.mh-extra.com/html/furukawa-electric/s178/s178_user-manual_2349550136.webp)
Programming Guide
8-32
8.4.1. Machine Check
1. A pop-up message prompts the user to remove the fiber
from the machine. Follow the message and press OK key.
2. Select “Execute” in the pop-up screen and press Enter key
to initiate the Machine Check.
Or, select “cancel” to cancel
the operation.
3. S178 automatically checks for dust in the camera and verify
the motor movements (see sample screen to the right).
Then, a pop-up screen prompts the user to set the fiber in
place.
4. Set the fibers on both sides and press
to initiate the remaining check.
5. S178 automatically performs the remaining check and a pop-up message prompts the user
to perform an arc check.
6. Press Enter key and select “Execute” or “Cancel” to perform the arc check. In the pop-up
screen, press Enter key again.
7. After the machine check is complete, the pop-up screen shows “Status OK”. Press Escape
key to finish the check.
8. If the machine fails Machine Check, the pop-up screen shows “Status NG. Call the Service
Center”. Please call your representatives or Furukawa Electric for further assistance.
9. If arc check fails, pop-up screen shows “Status NG. Remove fibers, and retry Arc Check”.
Perform an arc check to optimize the arc power.
Summary of Contents for S178
Page 2: ......
Page 3: ......
Page 22: ......
Page 40: ...External Description 4 2 Electrode V Groove Fiber Holder Fiber Clamp...
Page 50: ......
Page 51: ......
Page 52: ......
Page 72: ......
Page 88: ......
Page 89: ......
Page 90: ......
Page 124: ...Programming Guide 8 20 Time chart of heater parameters...