Page 5 of 5
#F x 8pcs
# G x 8pcs
#H x 8pcs
#1
#3
#4
#F
#G
#H
#I
#E x 6pcs
#4
#5
#E
Attach threaded studs (#F) to the headboard (#1) and
footboard (#3), then align side rails (#4) to the threaded
studs. Secure by using half moon washers (#G) and hex
nuts (#H).
Attach support legs (#6) to the slats (#5). Adjust
levelers on the support legs (#6) according to ground
level.