background image

2

TABLE OF CONTENTS

1   General information 

............................................3

1.1   Safety instructions ..................................................................3
1.2   Accident prevention ................................................................3
1.3  Qualification of employed staff ...........................................3
1.4   Intended use .............................................................................3
1.5   Private use .................................................................................4
1.6   Danger zone ..............................................................................4

2   Transportation/storage 

......................................4

2.1   Transportation ..........................................................................4
2.2   Items delivered.........................................................................4
2.3   Packaging ...................................................................................4
2.4   Temporary storage ..................................................................4
2.5   Transportation ..........................................................................4
2.6   Disposal ......................................................................................4

3   Installation ..........................................................5

3.1   Installation site.........................................................................5
3.2   Installation on a mounting plane/

foundation .................................................................................5

3.2.1 Console design .........................................................................5
3.2.2 Flange design 

............................................................................5

3.3  Inlet pipe joint connection .....................................................5
3.4  Earthing the device via the lightning conductor .............6
3.5   Removal .....................................................................................6

4   Commissioning 

....................................................6

4.1   Safety inspections ...................................................................6
4.2   Initial commissioning .............................................................6
4.2.1 Test run .......................................................................................6
4.2.2  Initial commissioning procedure .........................................7
4.2.3  Adjusting the housing position ............................................7

5   Electrical connection 

...........................................7

5.1  Terminal connection diagrams ............................................7
5.2   Cable connections ...................................................................7
5.3   Thermal contact/PTC thermistor 

for motor protection ...............................................................

8

5.4  Fluctuating power supply .....................................................8
5.5   Connection diagrams .............................................................8

6   Operation 

.............................................................8

6.1   Decommissioning ....................................................................8
6.2   Re-initialising the device after maintenance 

or repair tasks ...........................................................................9

 Maintenance tasks and troubleshooting ..........9

7.1   Standstill ....................................................................................9
7.2  Sporadic fan operation...........................................................9
7.3  Continuous fan operation ..................................................10
7.4   Malfunctions ..........................................................................10
7.5  Explanation of symbols ......................................................12

8   Copyright .......................................................... 12

9   Emergencies 

..................................................... 12

10   Operator’s responsibilities .............................. 12

11   Identification plate .......................................... 12

EC declarations of conformity ................................... 13

Summary of Contents for FRv 075

Page 1: ...l 6 4 Commissioning 6 4 1 Safety inspections 6 4 2 Initial commissioning 6 4 2 1 Test run 6 4 2 2 Initial commissioning procedure 7 4 2 3 Adjusting the housing position 7 5 Electrical connection 7 5 1...

Page 2: ...a tion and EU Machinery Directive 2014 34 EU ATEX apply Ensure that no critical gas concentrations are present during repair maintenance and assembly tasks in explosion protec tion zones Use a gas det...

Page 3: ...echnical data Secure the fan using appropriate slings before transportation Ensure the stability of the unit i e do not stack units 2 2 Items delivered Remove the packaging immediately on delivery Che...

Page 4: ...ble 3 2 1 Console design Follow these instructions step by step 1 Trace the frame s hole pitch onto the mounting surface the foundation 2 Drill the four holes using a drill that is suitable for the sc...

Page 5: ...he fan is then only attached to the foundation by its own mounting parts console or flange 4 Undo the mounting screws secure the fan against tipping over and then remove the fan from the foundation 5...

Page 6: ...hanism 5 Hand over the system according to specifications Excess grease may leak out of the labyrinth grease filling during initial commissioning 4 2 3 Adjusting the housing position In version C cons...

Page 7: ...er the repair switch is used to switch the device on and off or the connection cable in the terminal box is discon nected and isolated Check that the fan is working correctly on a daily basis giving p...

Page 8: ...e terminal box and insulate the cable ends Only begin maintenance or repair tasks once the fan impeller has come to a standstill and the motor has cooled DANGER OF INJURY FROM FLYING PARTS Before cond...

Page 9: ...ew one if necessary Check the accessories Check the electrical connections Check electrical wires and connecting terminals for corro sion and clean if necessary Check the power consumption if motor pr...

Page 10: ...mpeller or nozzle b Relative positions of impeller and nozzle have changed Check impeller area for foreign bodies check motor attachment Release support centre impeller nozzle and retighten screws Fan...

Page 11: ...or author 9 EMERGENCIES In emergencies switch off the main switch or disconnect the power plug Fire extinguishers of fire classes A B C and F must be used in case of fire These fire extinguishers mus...

Page 12: ...h the standards listed below Directive standard Title DIN EN ISO 12100 2011 Safety of machinery General principles for design Risk assessment and risk reduc tion DIN EN ISO 5801 2018 4 Fans Performanc...

Page 13: ...andards listed below Directive standard Title DIN EN 1127 1 2011 10 Explosive atmospheres Explosion prevention and protection Part 1 Basic concepts and methodology DIN EN ISO 80079 36 2016 Part 36 Non...

Page 14: ...15 SPACE FOR NOTES...

Page 15: ...EN 12 2019 FUNKEN Kunststoffanlagen GmbH Meysstrasse 1 53773 Hennef Germany Telephone 49 2242 92 09 0 Fax 49 2242 92 09 11 Email funken funken de K u n s t s t o f f a n l a g e n...

Reviews: