J OIL-E-08 2008
2
FIg. 11 COMMISSIONINg THE BOILER
13
Oil Supply Pipes
Feed Water
Line
Main Steam Valve
Oil
Flow /
Return
Pipes
Control Box
Isolator Switch
Cleanout Door
Cleanout Handhole
Water Column
Blowdown
Valve
Engineers Test
Button (PM5)
Sight Gauge
Blowdown
Valves
Oil Strainer
Water Level
Sight Gauges
Boiler
Data
Plate
Main Air Intake
2