J OIL-E-08 2008
FIg. 3 TyPICAL INSTALLATION
5
ST
ANDARD BOILER
TRIM SUPPLIE
D
WHEN ORDERING
THE BOILER
STEAM SUPPL
Y
PIPE SAFET
Y
VA
LV
E
TO
SAFE
AREA, FITTIN
G
UNIONS
AND DRAIN
DRAUGHT ST
ABILISER
(WHERE
FITTED)
WA
TER
COLUM
N
BLOWDOWN LINE
BOILER BLOWDOWN VA
LV
E
CLEANOU
T
DOOR
FEED
WA
TE
R
CHECK
VA
LV
E
FLUE SPIGOT
CONDENS
AT
E RETURN
FLEXIBLE LINK
OVERFLOW
MAKE-U
P
SUPPL
Y
FEED
WA
TER
PUMP
NOTE:
A
BREAK
TA
NK MA
Y
BE REQUIRED CHECK
TH
E
LOCA
L
WA
TER
AUTHORITY
BYE-L
AW
S
OVERFLOW TO
DRAIN
DRAIN
ST
AINLESS STEEL T
ANK SET
ISOLA
TIN
G
VA
LV
E
STRAINER
FU
LT
ON
BLOWDOWN
SEP
ARA
TO
R
CONNECTIONS
TO
OIL
ST
ORAGE T
ANK
OIL
FEED
LINE
OIL
FIL
TE
R
(MET
AL
CA
RT
RIDGE)
FIT
AN ISOLA
TING
VA
LVE IN
OIL
RETURN LINE ON
LY
IF OIL
T
ANK OR PIPE WORK
IS
ABOVE BURNER LEVEL
VEN
T
FIL
L
OIL
RETURN LINE
SIGH
T
GLASS
ISOLA
TIN
G
VA
LV
E
CHECK
VA
LV
E
SLUDG
E
COCK
BAL
L
VA
LV
E
FIRE
VA
LVE LINE
Cowl
Flue
D = Diameter of flue
H = 1.5 X
D
H
D
2
2
Summary of Contents for 10J
Page 42: ...J OIL E 08 2008...
Page 56: ...J OIL E 08 2008 A0 2 1 BOILER OIL 1 2 3 4 5 6 December 12 2004...
Page 76: ...J OIL E 08 2008 F1 4 1 WATER LEVEL GAUGE ASSEMBLY 6 60 350mm and 300mm Clifton December 2004...
Page 84: ...J OIL E 08 2008 H1 1 1 PUMP FEED WATER 1 December 2004...
Page 86: ......