3-4
SPARC Enterprise M4000/M5000 Servers Installation Guide • December 2010
FIGURE 3-1
M5000 Server Dual-power Feed UPC Connections
3.2.2
Verifying the Power Input Connections Before
Applying Power
●
Have the site electrician verify that the input power source fulfills the power
requirements.
Refer to the
SPARC Enterprise M4000/M5000 Servers Site Planning Guide
for input
power requirements
.
Note –
The server end of the power cords should have been connected prior to
shipment (for servers preinstalled in an equipment rack) or when the server was
mounted in the equipment cabinet. If the server ends of the power cords were not
connected previously, connect them before continuing.
#3 #2
#1 #0
UPC#1
UPC#0
UPC Interface Cables
UPC#1
AC#1
UPC#0
AC#0
Circuit
breaker
Circuit
breaker
Summary of Contents for SPARC Enterprise M4000
Page 4: ......
Page 8: ...viii SPARC Enterprise M4000 M5000 Servers Installation Guide December 2010 ...
Page 24: ...2 10 SPARC Enterprise M4000 M5000 Servers Installation Guide December 2010 ...
Page 40: ...3 16 SPARC Enterprise M4000 M5000 Servers Installation Guide December 2010 ...
Page 47: ...Appendix A System Views A 5 A 2 M5000 Server Views FIGURE A 2 shows the M5000 server ...
Page 56: ...A 14 SPARC Enterprise M4000 M5000 Servers Installation Guide December 2010 ...