![Fujitsu SOFTUNE F2 MC-16 User Manual Download Page 285](http://html.mh-extra.com/html/fujitsu/softune-f2-mc-16/softune-f2-mc-16_user-manual_118473285.webp)
271
CHAPTER 2 DEPENDENCE FUNCTIONS
2.5.9
Power-On Debugging
This section explains power-on debugging by the emulators for the MB2198.
■
Power-on Debugging
Power-ON debugging refers to the operation to debug the operating sequence that begins when the power to
the target is switched on.
For products with a dedicated power-on debugging terminal, the MB2198 emulator can debug the sequence
performed immediately after power-on. The following functions are available:
•
Code break
•
Data break
•
Sequencer
•
Trace trigger
•
Trace measurement
•
Coverage measurement
The power-on debugging procedure is described below:
•
Set the DIP switch on the adapter board mounted in the upper part of the emulator.
•
Turn on the target board and emulator main unit.
•
Launch Workbench to start debugging.
For debugging, set hardware breaks, etc.
•
To start a power-on debugging, run [Execute] - [Power-ON Debug] menu.
Input the lower limit value of the monitoring voltage from the [User Power Monitor Voltage] dialog box
to display PON in the input status bar.]
•
Run the program.
•
Turn the target board off while running and then back on.
•
Conduct debugging.
•
To terminate the power-on debugging, run [Execute] - [Power-ON Debug] menu.
Summary of Contents for SOFTUNE F2 MC-16
Page 2: ......
Page 3: ...FUJITSU SEMICONDUCTOR LIMITED F2 MC 16 FAMILY SOFTUNETM Workbench USER S MANUAL ...
Page 4: ......
Page 8: ...iv ...
Page 14: ...x ...
Page 342: ...328 CHAPTER 2 DEPENDENCE FUNCTIONS ...
Page 343: ...329 INDEX INDEX The index follows on the next page This is listed in alphabetic order ...
Page 352: ...338 INDEX ...
Page 354: ......