A26361-K547-Z400-1-7419
English - 7
Preparation for use and operation
!
Please take note of the safety information in the "Important notes" chapter.
Unpacking and checking the delivery
It is recommended not to throw away the original packaging material! It may be required for
reshipment at some later date.
Ê
Unpack all the individual parts.
Ê
Check the delivery for damage incurred during transportation.
Ê
Check whether the delivery agrees with the details in the delivery note.
Should you discover that the delivery does not correspond to the delivery note, notify your local
sales outlet immediately.
i
If you have received drives or boards with your Workstation, please do not install them
until after initial installation. How to install drives and boards is described in the chapter
"System expansions".
Steps for initial setup
When starting up for the first time, the devices (monitor, mouse, keyboard etc.) are connected to the
workstation and the software provided is set up.
When you set up the workstation for the first time, you should carry out the following steps in the
order shown.
1.
Decide where you are going to install the workstation.
2.
Connect the external devices to the workstation.
3.
Check the rated voltage of the workstation and connect it to the mains voltage.
4.
Switch the workstation on and follow the instructions on the screen.