2.3
Average task duration
Hardware: 10 minutes
The average task duration including preliminary and concluding steps is
indicated at the beginning of each procedure next to the procedure class.
The following table gives an overview of steps taken into account for
calculating the average task duration.
Step
included
Explanation
Server shutdown
no
Shutdown time depends on hardware and
software configuration and may vary
significantly.
Software tasks necessary before
maintenance, see
.
Rack removal,
disassembly
yes
Making the server available, removing the
server from the rack (if applicable).
Transport
no
Transporting the server to the service table
(where required) depends on local
customer conditions.
Maintenance
procedures
yes
Maintenance procedures including
preliminary and concluding software tasks.
Transport
no
Returning the server to its installation site
(where required) depends on local
customer conditions.
Assembly, rack
installation
yes
Reassembling the server, installing the
server in the rack (if applicable).
Starting up
no
Booting time depends on hardware and
software configuration and may vary
significantly.
Table 1: Calculation of the average task duration
Before you start
TX2550 M5
Upgrade and Maintenance Manual
29
Summary of Contents for PRIMERGY TX2550 M5
Page 20: ...Content Upgrade and Maintenance Manual TX2550 M5 ...
Page 106: ...Basic hardware procedures 106 Upgrade and Maintenance Manual TX2550 M5 ...
Page 322: ...Fans 322 Upgrade and Maintenance Manual TX2550 M5 ...
Page 392: ...Expansion cards and backup units 392 Upgrade and Maintenance Manual TX2550 M5 ...
Page 408: ...Main memory 408 Upgrade and Maintenance Manual TX2550 M5 ...
Page 428: ...Processor CPU 428 Upgrade and Maintenance Manual TX2550 M5 ...
Page 522: ...System board and components 522 Upgrade and Maintenance Manual TX2550 M5 ...
Page 631: ...List of all used screws for PRIMERGY Servers Assembled in Germany and Japan February 2019 ...