44
Operating Manual
TX200
S5
Installing/removing the rack model
Installing the hardware
3rd party racks
Certain general conditions must be met:
–
Installation dimensions (see the dimensions shown in
1
Front of rack
2
Rear of rack
A
Rack depth (comparison PRIMECENTER Rack 940/1000/1100 mm)
B
Rack width (comparison PRIMECENTER rack 700 mm)
C
Clearance for 19” installation level
C1
Front 19” installation level
C2
Rear 19” installation level
D
Cable routing area (cable area depth) and ventilation
E
Space for front panel and ventilation
F
Space for right and left support systems
P
PRIMERGY rack installation depth
a1
Front left support upright
a2
Front right support upright
b1
Rear left support upright
b2
Rear right support upright