249
PRIMERGY TX120 User’s Guide
Ap
pend
ix
(Window example)
C.2
Remote Power Supply Control
This section explains how to control the server power supply remotely.
The server power supply can be remote-controlled with the terminal software on the PC.
Starting Up the Remote Controller
1
Start up the terminal software.
The remote control window appears.
Power state is displayed next to "Power Status:".
table: Meaning of [Power Status]
Display
Description
On
The server is powered on.
Off
The server is powered off.
****************************************
* Welcome to PRIMERGY Remote Manager *
* Firmware Revision x.xxA (x.xx) *
* SDRR *.** ID 0203 TX120 *
* Firmware built xxx xx xxxx xx:xx:xx *
****************************************
System Type : PRIMERGY TX120
System ID : xxxxxxxx
System Name : TX120-2 (xxx.xxx.xxx.xxx)
System OS : xxxxxxxx
System Status: OK
Power Status : On
Please enter user name :
Please enter pass phrase :
Summary of Contents for Primergy TX120
Page 6: ...6 ...
Page 12: ...12 ...
Page 122: ...122 Chapter 4 Manual OS Installation ...
Page 152: ...152 Chapter 5 Operations after OS Installation ...
Page 188: ...188 Chapter 7 Installing Hardware Options ...
Page 210: ...210 Chapter 8 Configuring Hardware and Utilities ...
Page 262: ...262 ...