background image

U41100-J-Z156-1-74

 

9

PRIMERGY S40-DF capacity extension Converting the PRIMERGY S40-DF

1.4.2

Removing and mounting the side or top cover

Figure 3: Removing the side cover (floorstand model)

Figure 4: Removing the top cover (stackable model)

Ê

Press the two buttons (1) and remove the left side cover or the top cover (2).

Mounting is performed in the reverse order.

1

1

2

2

1

1

Summary of Contents for PRIMERGY S40-DF

Page 1: ...apacity Extension Xenia Fierley Siemens Nixdorf Informationssysteme AG ICP CS PS QM 3 81730 München e mail email manuals fujitsu siemens com Tel 089 636 47896 Fax 0 700 372 00000 U41100 J Z156 1 74 Sprachen En Edition May 2001 ...

Page 2: ...s your comments are included at the back of the manual There you will also find the addresses of the relevant User Documentation Department Copyright and Trademarks Copyright 2001 Fujitsu Siemens Computers GmbH All rights reserved Delivery subject to availability right of technical modifications reserved All hardware and software names used are trademarks of their respective manufacturers This man...

Page 3: ...German English ...

Page 4: ......

Page 5: ... 1 3 3 Notes on transportation 4 1 4 Converting the PRIMERGY S40 DF 5 1 4 1 Removing and mounting the door 8 1 4 2 Removing and mounting the side or top cover 9 1 4 3 Removing and mounting the protective shield 10 1 4 4 Converting the internal configuration 11 1 4 5 Installing the LVD extender board 17 1 4 6 Connecting the capacity extension 19 Related publications 21 Index 23 ...

Page 6: ......

Page 7: ... Configurations in the PRIMERGY S40 DF Operating Manual In order to use a configuration with three external PRIMERGY S40 ES units you will need the 1 channel version of the PRIMERGY S40 DF This manual contains conversion instructions which describe the steps required to prepare a PRIMERGY S40 DF 3 channel version for capacity expansion with three PRIMERGY S40 ES subsystems For more assistance in u...

Page 8: ...to be familiar with the hardware and data transmission concepts to understand the various activities described 1 2 Notational conventions bold type Used for emphasis in the body of the text quotation marks Used for references to other chapters sections or manuals Ê Identifies an action that you need to take V CAUTION Indicates a warning which if not observed could jeopardize your health or the pro...

Page 9: ...ote that any unauthorized opening of the device will result in the invalidation of the warranty and exclusion from all liability Make sure that no objects such as bracelets or paper clips or liquids fall into the device as this may result in an electric shock or a short circuit Before opening the unit switch off the device and then pull out the power plugs Note that switching off the device does n...

Page 10: ... some other suitable grounding cable that connects you to the external housing of the system unit Ê Place all components on a pad which is free from electrostatic charge I For detailed instructions on handling ESD sensitive modules please read the German documentation Richtlinie zur Handhabung von elektrostatisch gefährdeten Bauelementen und Baugruppen EGB or ITS Rundschreiben Nr 4 95 I An ESD kit...

Page 11: ... from transportation or any deviations in the supplied contents and the delivery note please contact your vendor immediately Floorstand and stackable models Ê Make sure that the storage subsystem is freely accessible from the front and the back Ê Switch off the storage subsystem and disconnect it from the power supply V CAUTION Note that switching off the device does not disconnect it from the pow...

Page 12: ... Connect the three PRIMERGY S40 ES units to the corresponding SCSI ports on the LVD extender board see section Connecting the capacity extension on page 19 I Note that if the PRIMERGY S40 ES is connected the system parameters PWR ON OFF BY BUTTON and PWR ON OFF BY CAN must be set to DISABLE Ê Connect the PRIMERGY S40 DF and the three PRIMERGY S40 ES units to the power supply Ê Connect the PRIMERGY...

Page 13: ...1 Ê Mount the protective shield for the SCSI area see section Removing and mounting the protective shield on page 10 Ê Insert the storage subsystem back in the rack and fasten it with the four knurled screws Ê Install the LVD extender board see section Installing the LVD extender board on page 17 Ê Install the three PRIMERGY S40 ES units in the rack with the help of the operating instructions for ...

Page 14: ...or I Since the same method applies to both the floorstand and stackable models only the floorstand model is shown in the following figure Figure 2 Removing the door floorstand model Ê Unlock the door with the key 1 and open it 2 Ê Remove the door by lifting it up 3 and out Mounting is performed in the reverse order 2 3 1 ...

Page 15: ...0 DF 1 4 2 Removing and mounting the side or top cover Figure 3 Removing the side cover floorstand model Figure 4 Removing the top cover stackable model Ê Press the two buttons 1 and remove the left side cover or the top cover 2 Mounting is performed in the reverse order 1 1 2 2 1 1 ...

Page 16: ...ive shield I Since the same method applies to all housing models only the rack mounted model is shown in the following figures Figure 5 Unlocking the protective shield Ê Unlock the protective shield for the SCSI area by turning the lever figure 5 and remove the protective shield figure 6 Figure 6 Removing the protective shield ...

Page 17: ...r technical specialists Any failure to observe the guidelines in this manual could expose the user to considerable risks electric shock fire hazards and could also damage the equipment Note that any unauthorized opening of the device will result in the invalidation of the warranty and exclusion from all liability In order to install a capacity expansion with three PRIMERGY S40 ES units you will ne...

Page 18: ...extension Figure 8 Internal cabling for 3 channel configuration initial state O N 1 2 3 4 S C S I b a c k p l a n e s c a g e 3 c a g e 2 c a g e 1 0 1 2 3 1 S T M L V D m o d u l e 1 1 3 2 3 3 c o n t r o l l e r b a c k p l a n e S T M L V D m o d u l e S T M L V D m o d u l e ...

Page 19: ... connection ports on the STM LVD modules of the SCSI drive cages 2 and 3 I For cage 1 the STM LVD module remains connected with the SCSI addressing cable on the backplane Ê Remove the STM LVD modules 2 of the SCSI drive cages 2 and 3 Removing the STM LVD module frees the SCSI connector X1 on the SCSI backplane see also figure 12 on page 16 c a g e 3 1 c a g e 1 c a g e 2 2 ...

Page 20: ... the backplane of cage 2 see figure 11 on page 15 Ê Pull out the SCSI connection cable for cage 2 3 2 from the controller backplane see also figure 8 on page 12 and connect it to the freed SCSI connector X1 see figure 12 on page 16 on the backplane of cage 3 see figure 11 on page 15 Ê Pull out the SCSI connection cable for cage 3 3 3 from the controller backplane see also figure 8 on page 12 and c...

Page 21: ...tor X5 on the STM LVD module on the backplane of cage 1 see also figure 12 on page 16 Connect the shorter strand 5 with the connector X4 on the backplane of cage 2 see also figure 12 on page 16 Connect the longer strand 6 with the connector X4 on the backplane of cage 3 see also figure 12 on page 16 This cable determines the SCSI addresses of the drives located in the SCSI cages 2 and 3 in the 1 c...

Page 22: ... DF capacity extension Figure 12 Internal cabling for 1 channel configuration final state O N 1 2 3 4 c a g e 1 c a g e 2 c a g e 3 X 5 X 1 X 4 X 4 X 1 0 1 2 S C S I b a c k p l a n e s c o n t r o l l e r b a c k p l a n e 1 5 4 3 1 3 2 3 3 6 S T M L V D m o d u l e ...

Page 23: ...he insertion slot for the LVD extender board is on the back of the storage subsystem and is covered by a plate If you need further assistance refer to the operating instructions for the PRIMERGY S40 DF Storage Subsystem Figure 13 Removing the plate Ê Loosen the two screws 1 and remove the plate covering the insertion slot 2 1 1 2 ...

Page 24: ...the notes pertaining to the ESD label in the section Important notes on page 3 Figure 14 Installing the LVD extender board V CAUTION Before installing the board make sure that all DIP switches are set to ON Ê Insert the board into the free slot 1 Ê Fasten the LVD extender board with the two knurled screws 2 1 2 2 ...

Page 25: ... a SCSI cable to one of the three SCSI ports on the LVD extender of the PRIMERGY S40 DF For further assistance in understanding these connections see also the operating instructions for the PRIMERGY S40 BS ES Storage Subsystem and the PRIMERGY S40 DF Storage Subsystem respectively PRIMERGY S40 ES 1 channel version PRIMERGY S40 ES 1 channel version PRIMERGY S40 ES 1 channel version DAC 960 FL FCL A...

Page 26: ......

Page 27: ...pply to your local office for ordering the manuals 1 Safety Guarantee and Ergonomics 2 19 Inch Rack for PRIMERGY and RM Systems Technical Manual 3 PRIMERGY S40 DF Storage Subsystem Operating Manual 4 PRIMERGY S40 BS ES Storage Subsystem Operating Manual ...

Page 28: ......

Page 29: ...extender board installing 17 M mounting removing the protective shield 10 mounting removing the side cover 9 N notational conventions 2 notes on safety 3 O OLR STM LVD flat ribbon cable 15 R removing mounting the door 8 S SCSI addressing cable 13 SCSI ports final state 16 initial state 14 STM LVD modules removing 13 T target group 2 transportation 4 ...

Page 30: ......

Page 31: ...ty Extension U41100 J Z156 1 74 Comments Suggestions Corrections Submitted by Fujitsu Siemens Computers GmbH User Documentation 81730 München Germany Fax 0 700 372 00000 email manuals fujitsu siemens com http manuals fujitsu siemens com ...

Page 32: ......

Page 33: ...tsu com Copyright Fujitsu Technology Solutions 2009 Hinweise zum vorliegenden Dokument Zum 1 April 2009 ist Fujitsu Siemens Computers in den alleinigen Besitz von Fujitsu übergegangen Diese neue Tochtergesellschaft von Fujitsu trägt seit dem den Namen Fujitsu Technology Solutions Das vorliegende Dokument aus dem Dokumentenarchiv bezieht sich auf eine bereits vor längerer Zeit freigegebene oder nic...

Reviews: