Executet the following file contained in the ServerStart CD-ROM.
[CD-ROM drive]: \PROGRAMS\GENERAL\Broadcom\MgmtApps\setup.exe
The installer starts up.
2
Proceed the installation by following the window instructions.
When the window below appears during the installation procedure, check [BASP] and click
[Next].
5.6.2 Load Balance
Once a Windows Server 2003 or Windows 2000 Server Team is created, virtual adapters (BASP Virtual
Adapter) will be created in the [Device Manager] and/or [Network and Dial-up Connections] of the
system. Do not disable or delete a virtual adapter from the [Device Manager] or [Network and Dial-up
Connections]. When deleting a virtual adapter, make sure to use BACS.
■
Load Balance Setup Procedure
1
Start up BACS. The procedure differs depending on the OS being used.
For Windows Server 2003
1. Click [Start]
→
[Control Panel]
→
[Broadcom Control Suite 2].
For Windows 2000 Server
1. Click [Start]
→
[Settings]
→
[Control Panel].
The [Control Panel] window appears.
2. Start up "Broadcom Control Suite 2".
Summary of Contents for Primergy RX600 S2
Page 6: ...6 ...
Page 110: ...110 Chapter 3 OS Installation Using ServerStart ...
Page 132: ...132 Chapter 4 Manual OS Installation ...
Page 228: ...228 Chapter 7 Installing Internal Options ...
Page 286: ...286 Chapter 9 Operation and Maintenance ...
Page 298: ...298 ...