32
Chapter 1 Overview
4
Press the power switch on the front of the server.
The server's power LED is lit green. When the power is turned on, the server performs Power On
Self Test (POST). If any abnormalities are detected by POST, error messages are displayed.
"8.2.2 Error Messages" (p.216)
The time to turn on the server can be set with the ASR setting (on the [Power On/Off] tab) using
ServerView.
For details, refer to "3.4 Serious Error Handling (ASR)" in "ServerView User's Guide".
It may take a few seconds until the server to power on after pressing the power switch.
1.4.3 Turning Off the Server
1
Make sure that the CD/DVD drive is empty.
2
Shut down the OS.
In the following cases, the server is turned off after the OS is shut down.
• Windows OS
• When ServerView is installed
In other cases, shut down the OS and make sure that the hard disk access LED is off. After
that, press the power switch of the server. The server's power LED lights amber.
• In the event of smoke or sparks, immediately unplug the electric cord. Failure
to do so may lead to a fire or electrocution.
• When turning off the server, be sure to follow the procedures described in this
section. Data can be lost if these procedures are not followed correctly.
• Be sure to wait for 10 seconds or longer after shutdown before turning the
server on.
The server's power
LED is lit green
Power switch
Summary of Contents for Primergy RX300 S4
Page 12: ...12 ...
Page 38: ...38 Chapter 1 Overview ...
Page 72: ...72 Chapter 3 OS Installation ...
Page 124: ...124 Chapter 4 Operations after OS Installation ...
Page 132: ...132 Chapter 5 High Reliability Tools ...
Page 180: ...180 Chapter 6 Installing Internal Options ...
Page 266: ...266 ...