Liquid cooling (LC) kit
Please ask your local Fujitsu service center for more information.
2.3
Average task duration
Hardware: 10 minutes
The average task duration including preliminary and concluding steps is
indicated at the beginning of each procedure next to the procedure class.
The following table gives an overview of steps taken into account for
calculating the average task duration.
Step
included
Explanation
Server shutdown no
Shutdown time depends on hardware and
software configuration and may vary
significantly.
Software tasks necessary before
maintenance, see
.
Rack removal,
disassembly
yes
Making the server available, removing the
server from the rack (if applicable).
Transport
no
Transporting the server to the service table
(where required) depends on local
customer conditions.
Maintenance
procedures
yes
Maintenance procedures including
preliminary and concluding software tasks.
Transport
no
Returning the server to its installation site
(where required) depends on local
customer conditions.
Assembly, rack
installation
yes
Reassembling the server, installing the
server in the rack (if applicable).
Before you start
RX2540 M6
Upgrade and Maintenance Manual
29
Summary of Contents for PRIMERGY RX2540 M6
Page 8: ...Upgrade and Maintenance Manual RX2540 M6 ...
Page 34: ...Before you start 34 Upgrade and Maintenance Manual RX2540 M6 ...
Page 86: ...Basic hardware procedures 86 Upgrade and Maintenance Manual RX2540 M6 ...
Page 120: ...Basic software procedures 120 Upgrade and Maintenance Manual RX2540 M6 ...
Page 232: ...Fans 232 Upgrade and Maintenance Manual RX2540 M6 ...
Page 328: ...Expansion cards and backup units 328 Upgrade and Maintenance Manual RX2540 M6 ...
Page 366: ...Processor CPU 366 Upgrade and Maintenance Manual RX2540 M6 ...
Page 462: ...Front panel 462 Upgrade and Maintenance Manual RX2540 M6 ...
Page 570: ...Appendix A 570 Upgrade and Maintenance Manual RX2540 M6 ...
Page 672: ...List of all used screws for PRIMERGY Servers Assembled in WCZ and FIT June 2021 ...