
RX2530 M4
Upgrade and Maintenance Manual
63
Basic hardware procedures
4.6
Connecting the power cord
4.6.1 Connecting the power cord (AC PSU)
V
CAUTION!
The AC PSU adjusts automatically to any power voltage in the range
from 100 V - 240 V (AC PSU Platinum) or 200 V - 240 V (AC PSU
Titanium). You may only operate the server if its rated voltage range
corresponds to the local mains voltage.
Ê
If applicable, connect the mains plugs to power outlets of the rack socket
strip.
I
To provide true phase redundancy, the second PSU should be
connected to a different AC power source from the other PSU. If one
AC power source should fail, the server will still continue to run.
Ê
Connect the power cords to the PSUs.
Ê
Ensure that the status indicator on the PSU is lit green, see section
"Indicators on PSUs (hot-plug PSUs)" on page 431
Figure 15: Locking the cable clamp of a PSU
Ê
Pull the cable clamp up (1).
Ê
Thread the power cord through the cable clamp (2).
Ê
Press the cable clamp down until it engages to secure the cable (3).
I
It will take about 60 seconds until the server can be powered on.
Summary of Contents for PRIMERGY RX2530 M4
Page 22: ...Upgrade and Maintenance Manual RX2530 M4 Contents ...
Page 34: ...34 Upgrade and Maintenance Manual RX2530 M4 Before you start ...
Page 108: ...108 Upgrade and Maintenance Manual RX2530 M4 Basic software procedures ...
Page 128: ...128 Upgrade and Maintenance Manual RX2530 M4 Power supply unit PSU ...
Page 192: ...192 Upgrade and Maintenance Manual RX2530 M4 Hard disk drive HDD solid state drive SSD ...
Page 200: ...200 Upgrade and Maintenance Manual RX2530 M4 Fans ...
Page 358: ...358 Upgrade and Maintenance Manual RX2530 M4 Front panel ...
Page 436: ...436 Upgrade and Maintenance Manual RX2530 M4 Appendix A ...
Page 438: ...438 Upgrade and Maintenance Manual RX2530 M4 Appendix B ...
Page 465: ...List of all used screws for PRIMERGY Servers Assembled in Germany and Japan January 2017 ...