32
Chapter 1 Overview
3
Turn on the display and peripheral devices.
4
Press the power switch on the front of the server.
The server's power LED lights green. When the power is turned on, the server performs Power
On Self Tests (POST). If any abnormalities are detected by POST, error messages are displayed.
"8.2.2 Error Messages" (p.208)
Wait 10 seconds or more to press the power switch after connecting the power cable.
The time to turn on the server can be set with the ASR setting (on the [Power On/Off] tab) using
ServerView.
For details, refer to "3.4 Serious Error Handling (ASR)" in "ServerView User's Guide".
1.4.3 Turning Off the Server
1
Make sure that the CD/DVD drive is empty.
2
Shut down the OS.
In the following cases, the server is turned off after the OS is shut down.
• Windows OS
• When ServerView is installed
• In the event of smoke or sparks, immediately unplug the electric cord. Failure
to do so may lead to a fire or electric shock.
• When turning off the server, be sure to follow the procedures described in this
section. Data can be lost if these procedures are not followed correctly.
• Be sure to wait for 10 seconds or more after shutdown before turning the
server on.
If not doing so, the server may not start up normally.
The server's
power LED
lights green.
Power switch
Summary of Contents for Primergy RX200 S4
Page 12: ...12 ...
Page 70: ...70 Chapter 3 OS Installation ...
Page 128: ...128 Chapter 5 High Reliability Tools ...
Page 200: ...200 Chapter 7 Configuring Hardware and Utilities ...
Page 238: ...238 Chapter 8 Operation and Maintenance ...
Page 264: ...264 Appendix ...