
Figure 22: Progress bar (RAID array rebuild)
CAUTION
The system is now operational, however, data redundancy will not be
available until the RAID array rebuild is complete. Depending on the
HDD capacity the overall process can take up to several hours, in some
cases even days.
You may notice a slight performance impact during rebuild.
5.3.16
Looking for MAC/WWN/GUID and SAS addresses
5.3.16.1
Basic information
The customer needs to know the new address of the controller:
–
When replacing the system board with an onboard LAN controller
–
When adding or replacing a network controller
–
When adding or replacing a SAS controller
Basic software procedures
88
Upgrade and Maintenance Manual
RX1330 M4
Summary of Contents for PRIMERGY RX1330 M4
Page 98: ...Basic software procedures 98 Upgrade and Maintenance Manual RX1330 M4 ...
Page 176: ...Hard disk drive HDD solid state drive SSD 176 Upgrade and Maintenance Manual RX1330 M4 ...
Page 290: ...Serial interface 290 Upgrade and Maintenance Manual RX1330 M4 ...
Page 364: ...Appendix A 364 Upgrade and Maintenance Manual RX1330 M4 ...
Page 398: ...List of all used screws for PRIMERGY Servers Assembled in Germany and Japan February 2019 ...