![Fujitsu PRIMERGY RX1330 M3 Upgrade And Maintenance Manual Download Page 53](http://html.mh-extra.com/html/fujitsu/primergy-rx1330-m3/primergy-rx1330-m3_upgrade-and-maintenance-manual_121086053.webp)
RX1330 M3
Upgrade and Maintenance Manual
53
Basic hardware procedures
4.2
Shutting down the server
V
CAUTION!
For further safety information, please refer to chapter
.
I
This step is only required when upgrading or replacing non-hot plug
components.
Ê
Inform the system administrator that the server will be shut down and put
offline.
Ê
Terminate all applications.
Ê
Perform the required procedures described in the preliminary steps of each
upgrade or maintenance task.
Ê
Shut down the server.
I
If the system is running an ACPI-compliant operating system,
pressing the On/Off button will perform a graceful shutdown.
Ê
Switch on the ID indicator on the front and rear connector panels of the
server as described in section
Summary of Contents for PRIMERGY RX1330 M3
Page 20: ...Upgrade and Maintenance Manual RX1330 M3 Contents ...
Page 48: ...48 Upgrade and Maintenance Manual RX1330 M3 Important information ...
Page 70: ...70 Upgrade and Maintenance Manual RX1330 M3 Basic hardware procedures ...
Page 132: ...132 Upgrade and Maintenance Manual RX1330 M3 Power supply unit PSU ...
Page 178: ...178 Upgrade and Maintenance Manual RX1330 M3 Hard disk drive HDD solid state drive SSD ...
Page 184: ...184 Upgrade and Maintenance Manual RX1330 M3 Fans ...
Page 222: ...222 Upgrade and Maintenance Manual RX1330 M3 Expansion cards and backup units ...
Page 244: ...244 Upgrade and Maintenance Manual RX1330 M3 Processor CPU ...
Page 310: ...310 Upgrade and Maintenance Manual RX1330 M3 System board and components ...