A26361-K875-Z102-3-7619
31
Hardware Installation
Installing/Removing the Server into the Rack
Figure 6: Mounting the telescopic rail in the PRIMECENTER/DataCenter Rack
Ê
Secure the end of the telescopic rails with two screws M4 each (1 and 2) at
the support uprights of the rack both front and rear as illustrated above.
Note: For the other side one end of the rail must be secured at the support
bracket.
Note: Two mounting springs each are used in the appropriate openings of
the support uprights and/or the support bracket (see figure 5 on page 30).
Ê
Adjust if necessary the length of the telescopic rails by using the oblong
holes located on each side of the rails.
Ê
Mount the server (see section “Mounting/Removing the Server” on
page 35).
Ê
Route the cables with the inserted server as described in the technical
manual of the corresponding rack.