![Fujitsu primergy h250 Manual Download Page 54](http://html.mh-extra.com/html/fujitsu/primergy-h250/primergy-h250_manual_121062054.webp)
46
U41271-J-Z156-2-76
The Control Panel
Preparation for use and operation
4.2
The Control Panel
Figure 23: The control panel
1 = Floppy disk drive
2 = Floppy disk drive access
indicator
3 = Power-ON indicator
4 = SCSI indicator
5 = ON/OFF button
6 = Reset button
7 = Systemdisplay (LCD)
8 = NMI button
9 = Menu toggle switch
10 = CPU error indicator
11 = System error indicator
!
1
2
3
4
5
6
7
9
1 0
1 1
8
N M I