
Removing a 2.5-inch HDD/SSD module
Figure 45: Removing a 2.5-inch HDD/SSD module
▶
Pinch the green release button and open the locking lever (1).
▶
Pull the HDD/SSD module out a few centimeters (2).
▶
Wait about 30 seconds to allow the HDD to spin down.
This is not necessary when removing an SSD.
This period is necessary for the RAID controller to recognize that an
HDD module has been removed and for the HDD to come to a stop.
▶
Pull the HDD/SSD module completely out of its bay.
Installing a 2.5-inch HDD/SSD dummy module
CAUTION
▶
If the removed HDD/SSD module is not replaced immediately,
always replace a dummy module into the unused HDD/SSD bay to
comply with applicable EMC regulations and satisfy cooling
requirements.
Hard disk drive (HDD) / solid state disk (SSD)
GX2570 M6
Upgrade and Maintenance Manual
93
Summary of Contents for PRIMERGY GX2570 M6
Page 66: ...Basic hardware procedures 66 Upgrade and Maintenance Manual GX2570 M6 ...
Page 78: ...Basic software procedures 78 Upgrade and Maintenance Manual GX2570 M6 ...
Page 154: ...Expansion cards and riser modules 154 Upgrade and Maintenance Manual GX2570 M6 ...
Page 188: ...Graphic processor GPU 188 Upgrade and Maintenance Manual GX2570 M6 ...
Page 234: ... Switching on the server on page 49 Midplane kit 234 Upgrade and Maintenance Manual GX2570 M6 ...
Page 242: ...Front panel 242 Upgrade and Maintenance Manual GX2570 M6 ...
Page 252: ...System board and components 252 Upgrade and Maintenance Manual GX2570 M6 ...
Page 274: ...Appendix A 274 Upgrade and Maintenance Manual GX2570 M6 ...
Page 281: ...AIOM adapter Card AIOM adapter Card AOM 438G AIOM P VGA Port C11 JVGA1 ...