
4.4.3
Removing the server from the rack
In most cases maintenance tasks can be performed while the server is
extended from the rack. However, depending on accessibility or security
guidelines, it may make sense to completely remove the server from the
rack cabinet for maintenance purposes.
CAUTION
At least two people are needed to lift the server out of the rack cabinet.
(For Japan, see "
安全上のご注意
".)
For configurations below 32 kg:
At least two people are needed to lift the server out of
the rack cabinet.
For configurations below 55 kg:
At least three people are needed to lift the server out of
the rack cabinet.
For configurations above 55 kg:
At least four people are needed to lift the server out of
the rack cabinet.
Basic hardware procedures
GX2570 M6
Upgrade and Maintenance Manual
43
Summary of Contents for PRIMERGY GX2570 M6
Page 66: ...Basic hardware procedures 66 Upgrade and Maintenance Manual GX2570 M6 ...
Page 78: ...Basic software procedures 78 Upgrade and Maintenance Manual GX2570 M6 ...
Page 154: ...Expansion cards and riser modules 154 Upgrade and Maintenance Manual GX2570 M6 ...
Page 188: ...Graphic processor GPU 188 Upgrade and Maintenance Manual GX2570 M6 ...
Page 234: ... Switching on the server on page 49 Midplane kit 234 Upgrade and Maintenance Manual GX2570 M6 ...
Page 242: ...Front panel 242 Upgrade and Maintenance Manual GX2570 M6 ...
Page 252: ...System board and components 252 Upgrade and Maintenance Manual GX2570 M6 ...
Page 274: ...Appendix A 274 Upgrade and Maintenance Manual GX2570 M6 ...
Page 281: ...AIOM adapter Card AIOM adapter Card AOM 438G AIOM P VGA Port C11 JVGA1 ...