![Fujitsu PRIMERGY CX400 M6 Upgrade And Maintenance Manual Download Page 90](http://html.mh-extra.com/html/fujitsu/primergy-cx400-m6/primergy-cx400-m6_upgrade-and-maintenance-manual_121047090.webp)
Figure 62: Progress bar (RAID array rebuild)
CAUTION
The system is now operational, however, data redundancy will not be
available until the RAID array rebuild is complete. Depending on the
HDD capacity the overall process can take up to several hours, in some
cases even days.
You may notice a slight performance impact during rebuild.
5.2.3
Switching off the ID indicator
▶
Press the ID button on the front panel, or use the iRMC S5 web interface or
ServerView Operations Manager to switch off the ID indicator after the
maintenance task has been concluded successfully.
"Locating the defective server" on page 39
the "ServerView Suite Local Service Concept (LSC)" and iRMC user
guides.
Using the ID button on the front panel
▶
Press the ID button on the front panel to switch off the ID indicators.
Basic software procedures
90
Upgrade and Maintenance Manual
CX400 M6